TOYOTA MANUFACTURING DERBY 1997 CONTRACT
CLIENT; TOYOTA MANUFACTURING UK
PROJECT: DERBY MANUFACTURING FACILITY
CONTRACTOR: TAKENAKA UK
PROJECT VALUE: £22,000,000
FLOOR VALUE: £900,000
SIZE: 47,700M2
DURATION: 8 WEEKS
DESCRIBTION: Snowden Seamless design A142 mesh reinforced saw cut gorund supported slab C35 concrete with dry shaped topping power floated to FM2 specification.